Development History
Development History
  • 2023
    H3C UAP672X outdoor wireless AP products jointly developed with customers won the IF and Red Dot awards
  • 2022
    To Undertake The Planning And Customized Development Of A Whole Series Of Test Instrument Product Iines In An Institute Of Aerospace Science And Technology

    The customized development and manufacturing of a variety of configurations of high spectrum signal tester have been completed. The whole machine engineering technology of Hao Hao helps the localization of the test instrument

  • 2021
    To Become Beijing LUSTER Company Quality Design And Manufacturing Supplier

    Helped customers to complete the customized development of large-array industrial camera, infrared thermal imager, dynamic capture camera and other products, and successfully listed, contributing to the smooth IPO of customers.

  • 2019
    Design And Development Of A New Generation Of H3C High-end Switch

    The new generation of AI intelligent switches for the core scenarios of data centers has been successfully completed

  • 2018
    Complete Another Supercomputer Development Mission

    OREA has completed the complete design and manufacturing of the Tianhe-3 supercomputer, which is another domestic supercomputer development task after Tianhe-2.

  • 2016
    And Then Partnered With Inspur

    Inspur "Kanas High-end Fault-tolerant Computer" won the China Design Red Star Award

  • 2015
    The Motion Capture System Won The Chinese Design Red Star Award
  • 2014
    Key Application Host Won The International IF And Red Dot Awards
  • 2013
    Once Again Completed The National 863 Project Design Task

    China has completed the design of the "Tianhe-2" supercomputer system for the National 863 project, making China the fastest supercomputer in the world after "Tianhe-1"

  • 2012
    Obtain The Title And Qualification

    OREA has also won the title of China's Top Ten Industrial Design Companies and National high-tech Enterprise qualification

  • 2011
    Developed China's First Large Mainframe System

    Completed the whole machine design and development of China's first 32-way large mainframe system in the National 863 Project, and won the "Gold Medal" of China Design Red Star Award.

  • 2010
    Achievement Of Domestic High-end Server

    Cooperated with Inspur to successfully develop the first 8-way server in China, which filled the gap in the domestic high-end server product market. The product was only launched in less than three months, and the sales volume has reached hundreds of millions

  • 2009
    Complete Machine Design And Supply Chain Services

    Moved into Beijing DRC Industrial Design Industrial Base and established OREA Technology (Beijing) Co., LTD. The company upgraded to "complete machine design and supply chain services

  • 2008
    The First Group To Settle In The City Of Design

    Participated in the establishment of Shenzhen Design Association, and was the first group to settle in Shenzhen Design Industrial Park

  • 2007
    Win-Win Cooperation

    Completed the design and planning of domestic 3G standard TD-CDMA series products, and won 33% market share for Beijing Datang Mobile Company

  • 2006
    Design Of Product Whole Machine

    Completed the complete product design of BDCOM, Digital China and other technology companies, and launched the processing and manufacturing business

  • 2005
    Establishment Of Company

    To establish the first design company in China with IPD integrated product development model as its management system.

FULL SUPPLY CHAIN